This job presented challenges due to tight access to and from site, only small machines could be used and small loads of materials.
With the works being so close to water courses, we also had to handle high ground water at times. The poor ground conditions made the excavation difficult but our skilled our was about to keep the area tidy and move the big boulders that were dug out.
Once uncovered, the drainage pipes and connectors were quickly fitted and reinstated without issues. |